Request a Bid or Estimate

- Contact us via email regarding your request

* required field.

Bid
Estimate
 
Public
Private
 
 
 
  123456
Bid Item (if Known)
Length
Casing Size
Thickness of Casing Wall
Crossing Under
Carrier Size/Material
Application Force Main
Gravity Sewer
Water Main
Force Main
Gravity Sewer
Water Main
Force Main
Gravity Sewer
Water Main
Force Main
Gravity Sewer
Water Main
Force Main
Gravity Sewer
Water Main
Force Main
Gravity Sewer
Water Main
Is Grade Critical? Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Is Line Critical? Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Pit Depth
Who Excavates the Pits? HBT Contractor
Will Trench Boxes be Required? Yes No
Who is to Install the Carrier Pipe? TD Contractor N/A
Is Fill of Annular Spaces Required? Yes No
Fill Material: Cellular Concrete Fill Flowable Fill Sand Fill
What are the Soil Conditions? Clay Gravel Mixed Rock Sand
Is the Water Table Above or Below the Pipe?
Are Boring Logs Available? Yes No
Vehicle Access to Site? Good Fair Poor
Do We Need to Hit an Existing Manhole or Line? Yes No

Comments